The work was started on 19 January 1996 following the invitation to the speed record attempt in Fakenberg. Initially the record attempt was scheduled in June, leaving only four months to build the Dreamliner.
16 March |
Front end and steering
All part except the steering hub are ready. The steering can be adjusted to different sensitivities within a wide range. The front end has been properly aligned and welded to the chaise.
Driver's safety cage
Tail section
|
10 April |
General
The chaise was on wheels by 23 March, one week ahead of plan. The tail section is considerably stiffer in torsion than expected. Despite its arrow width the car has proven remarkably difficult to turn over on its side.
Driver's safety cage
Tail section
|
6 May |
Front end
All structure complete. Some welding remains to be done. The pedal arrangement is approaching completion.
Tail section
|
21 May |
Front end
All welding completed. The aluminum lining of the driver's compartment is completed. The aluminum body pieces are ready and glued tin place. All the safety harness attachments are ready. The steering finalized. The pedals are ready and have been put in place but not hooked up. The work on the composite body panels has begun.
Tail section
Miscellaneous
|
29 May |
General
The car was run at Tullinge airfield on 26 May. The cooling system works beyond expectation. The car seems to require very little power and is showing no signs of tipping over.
Front end
Tail section
|
June 5 |
General
The record attempts in Falkenberg has been postponed until September due to bad weather. This gives the team some much appreciated extra time. After a few days of well earned rest the work is resumed.
Front end
Tail section
|
12 July |
General
During June, very little work has been done on the Dreamliner. The team members has taken vacation from the project to attend more urgent matters like friends and family. Some minor body work has been done and the 250cc engine has been returned to its owner. The search for a new engine has started. |
16 August |
General
A 350cc motorcycle was bought on August 16. An intense work of integrating the new engine started immediately. At the same time all details on the body like intakes, attachment pints and hinges are being finalized.
|
4 September |
General
The front wheel geometry has been modifier after the last test runs. The last attachments for the engine cowling are ready. A special cart for turning the car has been manufactured. The car and all necessary equipment has been packed in the car and trailer. The trip to Falkenberg begins. |